Solo Bridges are small pedestrian bridges that are preferably executed with a slight arch. The entire load-bearing deck structure comprises a thick-walled CorTen steel plate: maximum dimensions 3 m - 10 ft wide and 8 m - 26 ft long. After a while, the horizontal CorTen sheet will turn dark brown. As an alternative to CorTen steel, the bridge deck can be finished with Solideck®70 in FSC hardwood or All Black.

The Solo fence is equipped with a stainless steel handrail on the inside (Ø 48 mm - 2”). The vertical posts are 70x70 mm -3”x3” and available in FSC hardwood such as in the Solid range or in recycled black plastic All Black beams. The result is a bridge fence with a distinctly graphic character. The posts are mounted invisibly and remain adjustable after installation.

    The maximum length of a single span is ca.8m
    Available as a flat or an arched bridge
    A width of maximum ca. 300 cm is advised because of the decking material
    On request the main dimensions of this product can be customized
    Norm bridge: Eurocode + nat annex
    Norm fence: NPR-CEN/TR 16949:2016

    Material

    • Weathering steel
      Yes
      Weathering steel
      Yes
      MaterialWheathering steel
      ColourWarm red-brown
      TextureRough
      Years to oxidate1-3 years
      Lifespanca. 50 years
      MaintenanceNone
      RecyclableYes
    • Powder Coating
      Powder Coating
      FinishPowder Coating
      MaterialSteel, aluminium, Corten Steel, galvanised steel
      ColourRAL
      TextureSmooth
      Lifespanca. 10 years
      MaintenanceNone
      RecyclableYes

    In the Bridge Process, Streetlife makes use of a six-step plan: from idea to realization. The diagram shows how Streetlife can assist you by providing the appropriate information at each stage of your layout plan. Short delivery times are possible; average 12-14 weeks after approval of the drawings by the client. Our bridges are delivered almost entirely in prefab state, so that installation usually requires only a few days. Experience has indicated that the delivery time depends more on the decision-making process than it does on the actual manufacturing process.