Bowie Bridges

Bridges

Bowie Bridges

The Bowie Bridge was inspired by the David Bowie song ‘Wild is the Wind’.

View specifications

Looking for a customised solution?

Bowie Bridges

The continuous fencing system of criss-crossed balusters, uninterrupted by posts, creates a fascinating image. The round stainless steel bars have alternating diameters (max. 30 mm), which results in a robust and rigid fence.
This fencing was specifically designed to prevent the possibility of users getting stuck between the balusters. If desired, the baluster pattern can be made denser in order to meet the most stringent safety standards. The Bowie Bridge is available in a slightly arched or flat version. The bridge’s maximum, uniformly distributed load-bearing capacity is 5 kN/m² (EU) - 90lbs/ft² (US) - 85 lbs/ft² (CA).
Bowie Bridges are available in a Corten or powder coated steel version in which the round balusters are replaced by Corten steel strips. A robust rounded handrail of hardwood sets off the fencing and is pleasant to the touch. A linear LED lighting line can be included in the fencing system. It is fully integrated in the handrail.

    The maximum length of a single span is ca.16m
    Available as a flat or an arched bridge
    A width of maximum ca. 300 cm is advised because of the decking material
    On request the main dimensions of this product can be customized
    Norm bridge: Eurocode + nat annex
    Norm fence: NPR-CEN/TR 16949:2016

    Material

    • Corten Steel
      Yes
      Corten Steel
      Yes
      MaterialWheathering steel
      ColorWarm red-brown
      TextureRough
      Years to oxidate1-3 years
      Lifespanca. 50 years
      MaintenanceNone
      RecyclableYes
    • Powder Coating
      Powder Coating
      FinishPowder Coating
      MaterialSteel, aluminum, Corten steel, galvanized steel
      ColorRAL
      TextureSmooth
      Lifespanca. 10 years
      MaintenanceNone
      RecyclableYes

    In the Bridge Process, Streetlife makes use of a six-step plan: from idea to realization. The diagram shows how Streetlife can assist you by providing the appropriate information at each stage of your layout plan. Short delivery times are possible; average 12-14 weeks after approval of the drawings by the client. Our bridges are delivered almost entirely in prefab state, so that installation usually requires only a few days. Experience has indicated that the delivery time depends more on the decision-making process than it does on the actual manufacturing process.

    Bridge Process

    Bowie Bridges

    The Bowie Bridge was inspired by the David Bowie song ‘Wild is the Wind’.

    Looking for a customised solution?

    Request quotation
    Materials
    Material
    Dimensions
    This is a customizable product. Please include your drawing or comment with the request.
    We will contact you.
    Accessories

    Looking for a customised solution?

    +1 (0)484 496 8281